Website reputation report

instagantt.com

Last checked 53 minutes ago · Point-in-time assessment

77/100Technical Safety ScoreIndependent technical assessment, not a visitor rating
Would you recommend this page? No community votes yet 0/0 Your vote is for this page in this report only—not the entire website. No account required · One vote per browser.
Captured homepage of instagantt.com in the current scan
Website screenshot from the current report

Share report

● Evidence is limited

What is this website?

Learn about Instagantt, the online Gantt chart software trusted by 500K+ users. Founded in 2013, our team is on a mission to make project planning visual and effortless.

No listed local patterns observedHomepage-only analysis is not a malware clearance. Read the scope and findings below.

77/100Safety Score
75%Evidence Confidence
Trust Radar evidence profile Eight evidence dimensions from zero to one hundred. Exact values surround the chart. Threat Intelligence55 Domain History92 Infrastructure95 Website Security95 Security Hygiene80 Transparency59 Reputation50 Operational Stability85
Trust RadarEight observed factors. Select one to inspect its evidence.

How to read this report

Safety Score evaluates observed signals. Evidence Confidence measures how complete, direct, fresh, and consistent those signals are.

No automated scan can guarantee that a website is safe.

Current report context

What changed since the last scan

  • No earlier report to compare
What this scan could verify · 6 observed, 0 unavailable
DNS observed
Registration lookup observed
Network observed
TLS observed
Website response observed
Website content observed

Unavailable and unperformed checks are not clean results. The detailed evidence below remains the source for each conclusion.

Report an inaccuracy in this report →

Independent evidence brief

What we observed about instagantt.com

Updated Oct 23, 2026

The latest scan examined 10 public pages on instagantt.com. Website descriptions below come from the site itself. Registration, connection and threat findings were checked separately.

Purpose and visible content

On its About page, the site says: Learn about Instagantt, the online Gantt chart software trusted by 500K+ users. Founded in 2013, our team is on a mission to make project…

Registrar and domain history

Registered on Apr 28, 2013. Registrar: NameCheap, Inc..

Recorded expiry date: Apr 28, 2027. Registry data can change.

Connection and hosting evidence

The checked homepage returned HTTP 200 in about 1000 ms.

A valid TLS certificate was observed, expiring Feb 23, 2027.

Threat checks and score context

External malware-provider coverage was unavailable. The report does not treat this missing check as a clean result.

Safety Score: 77/100. Evidence Confidence: 75%. These measure different things.

Community reviews of instagantt.com

No approved reviews yet ☆☆☆☆☆

Visitor experiences are separate from the independent technical Safety Score.

Visitor opinions remain separate from the technical Safety Score.

Public content profile

Pages reviewed on instagantt.com

10 of up to 10 pages

We sampled public pages from this website to understand its subject and contact paths. The titles and short descriptions below come from the website itself. They are not endorsements or independent safety findings.

Online Gantt Chart Maker & Software for Project Planning | InstaganttCreate Gantt charts online with drag-drop scheduling, dependencies, AI assistant, baselines, and real-time collaboration. Used by 500K+ users. Free plan available. About Instagantt | Gantt Chart Software Since 2013Learn about Instagantt, the online Gantt chart software trusted by 500K+ users. Founded in 2013, our team is on a mission to make project planning visual and effortless. Contact Instagantt — Support, Sales & PartnershipsGet in touch with the Instagantt team. Email support and general inquiries. Instagantt Help Center | Product Guides & TutorialsBrowse 47 step-by-step guides covering every Instagantt feature — Gantt views, tasks, dependencies, workbooks, sharing, and more. Project Management Guide 2026 | Gantt Chart Tutorials | InstaganttMaster project management in 2026 with our comprehensive Gantt chart guides. Learn best practices, timelines, dependencies, milestones, and more. Instagantt Pricing & Plans | Free Gantt Chart SoftwareSimple, transparent pricing for Instagantt. Free plan for Asana projects, Individual at $12/mo, and Teams at $24/mo. 7-day free trial, no credit card required. Gantt Chart Templates - Free Project Management Templates | InstaganttBrowse our collection of free Gantt chart templates for project management, marketing, software development, HR, and more. Start your next project in seconds. MCP Server for AI Agents | InstaganttAI agents create Gantt charts from scratch via MCP, iterate on them, and output a public view and SVG. Import the result into Instagantt when ready. Log In to Instagantt — Access Your Gantt ChartsLog in to your Instagantt account. Choose between Standalone or Asana-integrated version to manage your projects. Create a Gantt Chart Online in Minutes | InstaganttBuild Gantt charts online with Instagantt, the Gantt maker and software trusted by 500K+ teams. Plan and track projects visually. Get started in minutes.

Public page evidence

Topics and keywords observed on instagantt.com

12 phrases

These phrases were extracted locally from sampled public page metadata. They are observations, not search-volume or ranking estimates.

ganttTitle, H1, Meta description9 sampled pages
gantt chartTitle, H1, Meta description6 sampled pages
projectTitle, H1, Meta description4 sampled pages
softwareTitle, Meta description5 sampled pages
freeTitle, H1, Meta description4 sampled pages
project managementTitle, H1, Meta description2 sampled pages
gantt chartsTitle, Meta description4 sampled pages
project planningTitle, H1, Meta description2 sampled pages
create ganttTitle, Meta description3 sampled pages
chart softwareTitle, Meta description2 sampled pages
projectsH1, Meta description3 sampled pages
dependenciesMeta description3 sampled pages

At a glance

Key findings

✓

Report is current

The displayed evidence comes from the published immutable scan.

i

Confidence is separate

Unavailable evidence is shown as missing and never counted as clean.

!

Verify before sensitive actions

Check the exact URL and context before payments, credentials, or downloads.

Fully explainable

Why this score?

Versioned weights
Threat IntelligenceWeight 25%
55/100

Threat providers were unavailable. The neutral uncertainty baseline is not a clean verdict.

Domain HistoryWeight 10%
92/100

Domain registration age and expiry were checked.

InfrastructureWeight 10%
95/100

Observed DNS records and network address were checked.

Website SecurityWeight 15%
95/100

Observed certificate validity and TLS protocol were checked.

Security HygieneWeight 15%
80/100

Observed security header values were checked for basic protective settings. Empty values, disabled HSTS and unrecognized values receive no credit. This is not a complete browser-policy validation.

TransparencyWeight 5%
59/100

Observed site metadata and About page were checked. Publisher-supplied details are not independently verified.

ReputationWeight 5%
50/100

Popularity is weak context, not proof of safety. Unranked sites use a neutral baseline.

Operational StabilityWeight 15%
85/100

Observed HTTP status and final connection scheme were checked.

Server-side analysis

Automated security checks

Local antivirus and phishing checks

ClamAV · homepage HTMLNo signature match in the sampled HTML
Engine version1.5.4
Signature database date (UTC)2026-10-23T06:24:08+00:00
HTML bytes submitted208,812
Phishing.Database · exact hostnameNot listed in this snapshot
Feed downloaded (UTC)2026-10-23T18:00:10+00:00
Hosts in local snapshot386,082

Sampled scripts and pages

Resource analysis incomplete

4 resources checked · 3 script links observed on the homepage. Partial resource coverage.

ClamAV inspects the fetched homepage HTML on our server. New scans also sample up to four linked scripts and two collected internal pages, with size and time limits. Scripts are not executed. Other downloads, private server files and logged-in pages remain outside this check. A signature match needs investigation and can be a false positive. No match is not a whole-site safety guarantee.

Exact hostname lookup uses a downloaded Phishing.Database snapshot. It does not send this domain to an external lookup API or mark sibling subdomains as harmful. Not listed does not mean safe. Snapshot age is download age, not proof that every entry was recently revalidated.

Homepage HTML only · Eight local rule families · local-security-v2

Checks use the fetched page and redirect chain. Scripts are not executed, forms are not submitted, and linked files are not downloaded. This is not a malware clearance.

Page resource inventory

Linked scripts3
Inline scripts4
Embedded frames1
External script hosts2

Counts describe the sampled HTML, not every resource loaded by the browser. External resources are common and are not automatically harmful.

No listed local patterns observed. The limited rule set cannot detect every threat or behavior.

External threat intelligence

Provider coverageNot checked

Local checks do not query external reputation databases. An unavailable check is never a clean result.

Registration

Domain information

Public RDAP observation
Canonical domaininstagantt.com
RegistrarNameCheap, Inc.
RegisteredApr 28, 2013
Domain age13 years
ExpiresApr 28, 2027
Registry statusesclient transfer prohibited
Report statePublished

Infrastructure

Network & hosting

Observed endpoint, not legal location
IP address18.245.175.109
Autonomous systemUnavailable
Network organizationUnavailable
Observed countryUnavailable
CDNCloudflare
Web application firewallNot detected

At a glance

Infrastructure summary

Observed during this scan

A compact view of the connection, DNS and security surface. These observations describe what the scanner could verify at scan time and do not prove ownership or ongoing availability.

HTTP response200 · https://www.instagantt.com/
Endpoint18.245.175.109
NetworkUnavailable
CDN and WAFCloudflare · Not detected
DNS surface20 records · 4 nameservers · 1 mail exchangers
Protection signals6 security headers · 6 technologies · DNSSEC unknown

Page telemetry

Observed page statistics

Safe metadata only

These counters describe the fetched response and sampled HTML. Script counts describe references in the markup, not a complete browser network log. Cookie counts cover observed response headers.

Response size208,812 bytes
HTTP check duration1,000 ms
Cookies observedUnavailable
Script resources3 · 2 external hosts
Frames and sampled checks1 frames · 4 resources checked

Encrypted transport

TLS certificate

Valid when observed
StatusValid when observed
ProtocolTLSv1.3
IssuercountryName=US, organizationName=Amazon, commonName=Amazon RSA 2048 M04
Valid fromAug 10, 2026
Valid untilFeb 23, 2027
Certificate names*.instagantt.com · instagantt.com · www.instagantt.com

Resolution

DNS footprint

DNSKEY status unknown

DNSKEY presence does not verify the DNSSEC signature chain. Missing records can mean no record was returned or the lookup was unavailable.

A18.245.175.109TTL —
A18.245.175.117TTL —
A18.245.175.86TTL —
A18.245.175.87TTL —
AAAA2600:9000:2662:1a00:1d:30a7:eec0:93a1TTL —
AAAA2600:9000:2662:3e00:1d:30a7:eec0:93a1TTL —
AAAA2600:9000:2662:4e00:1d:30a7:eec0:93a1TTL —
AAAA2600:9000:2662:5a00:1d:30a7:eec0:93a1TTL —
AAAA2600:9000:2662:5e00:1d:30a7:eec0:93a1TTL —
AAAA2600:9000:2662:a800:1d:30a7:eec0:93a1TTL —
AAAA2600:9000:2662:ac00:1d:30a7:eec0:93a1TTL —
AAAA2600:9000:2662:f200:1d:30a7:eec0:93a1TTL —
NSns-1441.awsdns-52.orgTTL —
NSns-1631.awsdns-11.co.ukTTL —
NSns-333.awsdns-41.comTTL —
NSns-682.awsdns-21.netTTL —
MX1 aspmx.l.google.comTTL —
TXTgoogle-site-verification=YsutunhuGS22FehTIE6tGT6S6z9Jb7SUN5lKMhW_KVkTTL —
TXTv=msv1 t=a91125552aba4ab9c34fa05686006fTTL —
TXTv=spf1 include:_spf.google.com ~allTTL —

DNS observations · no external lookup API

Domain email protection

Exact-host SPF and DMARC observations help the owner investigate email impersonation risks. They are separate from website malware checks and do not change the Safety Score.

SPFPolicy record observed, not fully validated
DMARCNo matching record returned for this exact hostname

What to do next

Review the records with your mail administrator. Inventory legitimate senders and test SPF and DKIM alignment before enforcing a stricter DMARC policy. Fix duplicate records and investigate overly permissive SPF rules.

This bounded check does not send email, probe SMTP, evaluate recursive SPF includes, verify DKIM signatures or apply organizational-domain DMARC inheritance. A missing subdomain record does not prove that no inherited protection exists. A DNS timeout is unknown, not an absent record. A policy record is not proof that messages authenticate successfully.

Responsible disclosure

security.txt

RFC 9116 observation

No readable security.txt file was observed at the standard locations. This is informational and is not evidence of malware.

Browser protections

Security headers

6 observed
content-security-policypresent default-src 'self'; script-src 'self' 'unsafe-inline' 'unsafe-eval' https://app.termly.io https://*.termly.io https://www.googletagmanager.com https://*.googletagmanager.com https://www.google-analytics.com https://*.google-analytics.com https://app.intercom.io https://widget.intercom.io https://js.intercomcdn.com https://connect.facebook.net https://static.hotjar.com https://script.hotjar.com https://www.googleadservices.com https://googleads.g.doubleclick.net https://www.gstatic.com; style-src 'self' 'unsafe-inline' https://fonts.googleapis.com https://static.hotjar.com; font-src 'self' data: https://fonts.gstatic.com https://*.hotjar.com; img-src 'self' data: blob: https: http:; media-src 'self' https:; frame-src 'self' https://app.instagantt.com https://*.instagantt.com https://app.termly.io https://*.hotjar.com https://td.doubleclick.net https://www.googletagmanager.com; connect-src 'self' https://app.instagantt.com https://*.instagantt.com https://app.termly.io https://*.termly.io https://www.google-analytics.com https://*.google-analytics.com https://analytics.google.com https://*.analytics.google.com https://stats.g.doubleclick.net https://*.g.doubleclick.net https://www.googletagmanager.com https://*.googletagmanager.com https://www.google.com https://pagead2.googlesyndication.com https://www.googleadservices.com https://connect.facebook.net https://www.facebook.com https://*.hotjar.com https://*.hotjar.io wss://*.hotjar.com https://*.intercom.io wss://*.intercom.io https://api-iam.intercom.io; object-src 'none'; base-uri 'self'; form-action 'self' https://app.instagantt.com
permissions-policypresent camera=(), microphone=(), geolocation=(), interest-cohort=()
referrer-policypresent strict-origin-when-cross-origin
strict-transport-securitypresent max-age=31536000; includeSubDomains; preload
x-content-type-optionspresent nosniff
x-frame-optionspresent SAMEORIGIN

Response headers

Cookie protections

Passive observation

No Set-Cookie header was observed on the sampled homepage response. Other pages may set cookies separately.

Detected stack

Technologies

Bootstrap 80% Cloudflare 98% Google Analytics 94% Google Tag Manager 96% Intercom 94% Tailwind CSS 72%

Versions are shown only when publicly exposed by the page or response headers. An observed version is not, by itself, proof of a vulnerability.

JavaScript library advisories

2 sampled JavaScript files checked locally with Retire.js. Database snapshot: 2026-10-23T02:40:09.003Z.

No supported library version was identified in the sampled files. This does not establish that the scripts are safe.

A version match is not proof that the website is infected or that an issue is exploitable here. Owners should review the advisory, check whether their code is affected and test an update. Up to four external script files are sampled, not every dependency, inline script or dynamically loaded resource.

About this website

What the site says about itself

Learn about Instagantt, the online Gantt chart software trusted by 500K+ users. Founded in 2013, our team is on a mission to make project planning visual and effortless.

View the site's About page ↗

This is publisher supplied information. The independent safety findings are shown separately.

Publisher supplied

Public contact details

These details were observed on the website, not independently verified as an active support channel.

Emailhello@instagantt.comSource: https://www.instagantt.com/contact

Structured facts

Website identity & response

Public page metadata
Page titleOnline Gantt Chart Maker & Software for Project Planning | Instagantt
First headingOnline Gantt Chart Softwarefor Project Planning
DescriptionCreate Gantt charts online with drag-drop scheduling, dependencies, AI assistant, baselines, and real-time collaboration. Used by 500K+ users. Free plan available.
Canonical URLhttps://www.instagantt.com/
Final URLhttps://www.instagantt.com/
HTTP response200 · text/html; charset=utf-8 · 1000 ms
Languageen
Structured typesBreadcrumbList · Corporation · FAQPage · ListItem · Question · SoftwareApplication · WebSite
Page page detectedhttps://www.instagantt.com/guidesAbout page detectedhttps://www.instagantt.com/aboutContact page detectedhttps://www.instagantt.com/contactSupport page detectedhttps://www.instagantt.com/help-guide
missing100% evidence confidence
1100% evidence confidence
1100% evidence confidence
en100% evidence confidence
1100% evidence confidence
1100% evidence confidence
1100% evidence confidence
Local headers.cors wildcard origin100% evidence confidence
Local headers.cors present100% evidence confidence
Local headers.cors credentials with wildcard100% evidence confidence
1100% evidence confidence
20100% evidence confidence
4100% evidence confidence
1100% evidence confidence
unavailable100% evidence confidence
Dns consistency.cname present100% evidence confidence
1100% evidence confidence
Local headers.permissions usb restricted100% evidence confidence
1100% evidence confidence
Local headers.permissions payment restricted100% evidence confidence
1100% evidence confidence
12100% evidence confidence
1100% evidence confidence
1100% evidence confidence
1100% evidence confidence
31536000100% evidence confidence
1100% evidence confidence
Local headers.csp wildcard sources100% evidence confidence
1100% evidence confidence
1100% evidence confidence
1100% evidence confidence

Connection path

Redirect chain

1 recorded hops
Hop 1https://www.instagantt.com/

The chain is shown exactly as observed by the scanner. A redirect is not itself a malware finding, but unexpected domains or an HTTP downgrade deserve review.

Premium monitoring

Catch downtime and security changes automatically

Regular checks, availability history, and alert emails are reserved for Premium websites. Free reports remain point-in-time scans and do not create recurring server work.

Enable monitoring for this website

Compared with the previous scan

What changed

A comparison will appear after the next completed scan.

Explainable matching

Digital fingerprint

fingerprint-v1
calm-radar-ring-690

Comparable components help find technically related websites. A match does not prove common ownership.

DnsHashed private comparison value
TechnologiesHashed private comparison value

Material changes only

Change history

Show change history

No meaningful changes recorded yet.

Website icon for instagantt.com

Visual evidence

Website screenshot

Screenshot of instagantt.com
Captured once in an isolated browser during this scan. Visual tint is an interface overlay. The original evidence is not duplicated.

For site owners

Show your verified trust report

Place this lightweight badge in your footer to show visitors an independent, dated WebsiteVirusScanner report. It can increase visitor confidence, but it never changes or guarantees the score.

Choose a badge style
Preview on your site
WebsiteVirusScanner trust badge preview

Use the current report link so visitors can verify the evidence. A badge is a transparency signal, not a paid ranking boost.

Questions about instagantt.com

FAQ

Still have questions? Contact us →
Is instagantt.com safe to visit?

The latest Safety Score is 77/100 with 75% Evidence Confidence. This is a point-in-time assessment of observed technical signals, not a guarantee. Check the exact address and avoid entering payment details if anything looks unusual.

Did the scan detect malware on instagantt.com?

ClamAV found no signature match in the sampled homepage HTML. External scripts, downloads and private server files were not checked. This is not a whole-site malware clearance.

When was instagantt.com registered?

The public registry record shows Apr 28, 2013. Registration details may be privacy-protected or updated later.

Did instagantt.com have a valid TLS certificate?

The scanner observed a valid TLS certificate using TLSv1.3. A valid certificate alone does not establish that the site is safe.

How does instagantt.com describe itself?

The website's About page describes its purpose in the report above. This is publisher-supplied information and is separate from independent security findings.

Can a paid listing change this website's score?

No. Premium placement and owner-supplied pages are labelled separately. Technical evidence, the Safety Score and moderation decisions remain independent.

Share your experience with instagantt.com

Community reviews are moderated and remain separate from the technical Safety Score.

Write review →